Water Pressure Testing Equipment 0-600bar Manual Hydro Hydraulic Test Pump

Water Pressure Testing Equipment 0-600bar Manual Hydro Hydraulic Test Pump

 

Merchandise Description

The fluid pressurized handle cabinet has been outfitted with the fluid booster pump,the travel air drinking water filter,the pressure regulator valve, Stress gauges and manual strain reduce valve. The primary parts of the equipment are assembled in closed stainless metal cabinet or stainless steel frames. The force gauge,valve and stress regulator will be mounted on the panel. The corresponding indication will also be marked on the panel.

The perfect working substantial force can be attained by changing the driving air strain. When the driving air stress and output strain are balanced, The pump will automatically stop the filling stress, and the output force will stay at the preset worth.

The hydraulic device can be utilised for stress screening of various factors, research and screening institutions and industrial stress subject.

Booster pump have a selection of stress ratios, These sequence of pumps are excellent choice for numerous hydraulic energy functions. The optimum operating pressure up to 640Mpa.

The output force is created by pneumatic booster pump, Therefore the electric link will not be needed.

The structural style of the Fluid pressurized control cabinet are compact and according to the specific need of buyers, Merged the air driven fluid booster pumps,valves ,control switches and other precision equipment are assembled in the frame or closed cupboard.

The pump will cease operating instantly when the output stress reaches the preset price, The pump will start routinely when the outlet stress drops a bit or the air drive force raises.

Product parameters

CZPT pumps feature is a big air piston joint to a scaled-down diameter piston. The force ratio is the difference of these two areas and is the approach of deciding greatest outlet pressure. Increased pressures received by using larger strain ratios.
CZPT product replicate the pumps nominal pressure ratios, although the complex knowledge signifies specific ratios. The outlet stress is very easily to set through a straightforward regulator. By multiplying the pressure ratio by the available shop air strain, the nominal liquid force can be calculated.
Essentially the principle of operation is equivalent to a reciprocating amplifier in which management of the piston at the conclude place is reciprocating , The computerized reciprocating movement of the piston is controlled by a constructed-in 4-way valve.
CZPT pumps are air pushed at a push air stress of three to 8 bar (29 to 116 psi) by the regular CZPT. 

Variety

Pressure ratio

Max outlet pressure  (bar)

Max flow   (L/min)

Link dimensions(inch)CZPT

Link measurement(inch)   Inlet

Connection dimension(inch)   Outlet

LU-LDD-16

16:one

128

19.73

G1/2

NPT 1/2

NPT one/two

LU-LDD-28

28:one

224

11.three

G1/2

NPT one/two

NPT one/two

LU-LDD-forty

40:one

320

7.69

G1/two

NPT 1/2

NPT one/2

LU-LDD-64

sixty four:1

512

4.94

G1/two

NPT 1/two

NPT three/8

LU-LDD-eighty

eighty:one

640

three.96

G1/two

NPT 1/2

NPT 3/8

LU-LDD-a hundred

one hundred:one

800

3.13

G1/2

NPT 1/two

NPT three/eight

LU-LDD-a hundred thirty

a hundred thirty:1

1040

two.four

G1/two

NPT one/2

M14*1.five

LU-LDD-a hundred seventy five

one hundred seventy five:one

1400

1.eighty one

G1/2

NPT 3/8

M14*1.5

LU-LDD-255

255:1

2040

1.23

G1/2

NPT one/4

M14*one.5

LU-LDD-400

four hundred:one

3200

.79

G1/2

NPT one/four

M14*1.five

Detailed Photos

Method configuration

The liquid booster pump mostly is made up of air travel chamber, pressurizing chamber, auto reversing valve, inlet check valve, outlet check valve, High good quality sealing parts, air generate piston, pressurizing piston, silencer and so on.
CZPT hydraulic examination pump program primarily contains an air driven liquid  booster pump, pressure gauges, liquid filter ,air filter, air regulating valve,manage valves,pipelines, cabinet , pressure release valve  etc.   
The principal components of the tools are assembled in shut stainless steel cupboard or stainless metal frames. The stress gauge,valve and force regulator will be mounted on the panel. The corresponding indication will also be marked on the panel.  
 

Merchandise positive aspects

 1. Outfitted with high quality pneumatic chemical reagent injection pump, It can effortlessly achieve any adjustable and controllable output pressure and flow.

two.The make contact with liquid part is stainless steel, strong corrosion resistance, suitable for a assortment of chemical reagents

three. It can be used at a variety of amounts of wellhead stress, the force system has management function.

4.CZPT reagent injection program output force is higher, The output stress can be altered through the stress regulating valve, the technique has to stop functioning below the set force

5.CZPT technological innovation, realistic construction style. The functions of little size, mild fat, beautiful visual appeal

6.By air/fuel driven, no need to have to use electric power, there will be no spark produced, protected explosion-evidence
 

CZPT & CZPT

 

 

Our Solutions

 1. We would like to offer our specialist guidance with regards to machines, supplies, packing and market place for this solution.

2. We would like to customise particular device in accordance to customer’s ask for.

three. We would like to help our clients for reserving ship as client request.

five. Procedure handbook will be provided right after shipment.

6. We offer two 12 months warranty.

seven. Totally free wearing components will be sent jointly with the equipment .

8. Functioning video clip of the machine will be despatched to you appropriately to your want.

Firm Details

FAQ

 1.Q : Are you maker ?

A: Indeed, We are the manufacturer with steady and enhanced R&D. Manufacturing, CZPT Check and services source.

two.Q : Can I get your price record ?

A: Of course, Confident. In get to deliver you our accessible presented price. Please decide on the items and permit us know the item design and need in depth.

three.Q : Do you have stock for all products?

A:In general, we have some inventory, whilst if you want a bulk order, we nevertheless want time to create it. Of program, we will notify all details you prior to your payment.

four.Q : What is payment phrases ?

A: Sample order : one hundred% complete payment before start off to manufacturing

Massive buy : thirty% deposit initial, 70% pay out right after see the BL copy

5.Q: Can give cost-free sample ?

A : Cost-free : if modest spare areas and the price not way too significantly is okay

Not Free of charge : the value high-priced and all the machine can not be free

six.Q : How long can be finished the items ?

Supply date:  five-30 doing work times soon after deposit paid out

Two several years guarantee, when the merchandise attain to vacation spot.

Water Pressure Testing Equipment 0-600bar Manual Hydro Hydraulic Test Pump