1400c High Temperature CVD Tube Furnace with Gas Flow Control

1400c High Temperature CVD Tube Furnace with Gas Flow Control

1400c High Temperature CVD Tube CZPT with Gasoline Circulation Management

Solution functions
one.Chamber material adopts large purity alumina ceramic fiber,which is new type assembled composition. And it is durable and durable and maintain no transformation with substantial temperature.
two.High purity quartz or alundum tube with stainless metal flange sealing on each ends with straightforward and affordable style.It is very easily disassembling, also conveniently for sintering samples in and out .
3. High heating velocity,and it takes 15-30 minutes from area temperature to 1000ºC
four.It adopts imported temperature control instrument, large precision of temperature handle,has the temperature payment and correction operate, precision ±1ºC
five. CZPTed temperature control instrument with programmable perform.It can established heating curve and programme 2 groups sixteen segments.
six.Integrative composition with superb look patent design.
seven. CZPTtronic elements and parts adopt DELIXI manufacturer with earth leakage function.It is secure and reputable.
eight. With alerting sign for the more than-temperature during the functioning method and it can full protective action routinely.
9. When plans are established and press the starting up button, the following actions will move forward immediately.
10.Gas route program can choose1 or 3 routes fuel mass circulation meter with blended system for fuel single-input single-output,and inlet gasoline with electronic accuracy manage. The touch display screen controls circulation swap and circulation time immediately,which achieve gas circuit control unattended operation with precision at ±1%  F.S and reaction time ≤4sec
eleven.Vacuum program adopts one particular set rotary-vane vacuum pump or vacuum device, making use of digital composite vacuum gauge or pirani gage. The measuring instrument is integrated on the temperature management panel and easy to procedure.    
Types:

Design Max. temperature Functioning
temperature
Tube measurement
(ΦxLength)
Heating length Voltage Power Heating aspect Temperature
precision
STGC-forty-twelve 1200ºC 1150ºC 40x1000mm 300mm 220V 2KW Resistance wire ±1ºC
STGC-sixty-12 60x1000mm 300mm 220V 3KW
STGC-80-twelve 80x1000mm 300mm 220V 4KW
STGC-100-twelve 100x1000mm 300mm 220V 4KW
STGC-40-14 1400ºC 1350ºC 40x1000mm 300mm 220V 2KW SiC rod ±1ºC
STGC-60-14 60x1000mm 300mm 220V 3KW
STGC-80-14 80x1000mm 300mm 220V 4KW
STGC-100-fourteen 100x1000mm 300mm 220V 5KW

CZPT & CZPT
one) Packing:From the within to outer packaging, is foam sponge, carton, wooden circumstance.
2) Transportation modes:Sea or Air transportation, TNT, DHL convey or FedEx.
3) You should make confident the ‘shipping address’ is your verified deal with.
4) We do check out every little thing in great issue just before we ship your parcel out.
five) We will process your order ASAP after payment is verified.
About Us:
1. We are a leading and expert company that specializes in the manufacture of substantial temperature muffle CZPTs
two. Our goods have a number of complex patents and have handed the ISO9001 quality technique certification and CE certification.
three. Our merchandise covers one thousand/1200/1300/1400/1600/1700ºC muffle furnace, tube furnace, vacuum box furnace, twin(multi) zone tube furnace, industrial furnace, elevator/base loading muffle furnace, automobile-sort bottom furnace, and many others.
four. By getting scientific and rigid management and initial-course technologies power,  Sante CZPT has provided heaps of muffle furnaces for faculties and universities, analysis institutes and enterprises, masking petrochemical, petroleum, smelting, casting, machinery producing, military industry, and other industries in China and abroad.

 

1400c High Temperature CVD Tube Furnace with Gas Flow Control